The 20 questions

  1. Which column in a test plan records what the solution actually did?

    • Remedial action
    • Test number
    • Expected result
    • Actual result
  2. What information is recorded in the expected result column of a test plan?

    • Bug fix
    • Tester name
    • Actual outcome
    • Planned outcome
  3. What is recorded in the remedial action column when a test fails?

    • The test date
    • The error code
    • The fix applied
    • The original data
  4. When should a failed test be repeated in the test plan?

    • During planning
    • Before testing
    • Without changes
    • After applying fix
  5. Which test data uses the largest allowed value, such as 100 for a 0-100 range?

    • Valid
    • Default
    • Extreme
    • Random
  6. Which test data would enter text into a numeric-only field?

    • Invalid (erroneous)
    • Extreme boundary value
    • Valid numeric entry
    • Normal data entry
  7. A cell accepts ages from 16 to 65. Which value is valid test data?

    • 15
    • abc
    • 30
    • 66
  8. Which activity is an example of technical testing?

    • Choosing colours
    • Designing layout
    • Asking user opinions
    • Checking formula results
  9. Which activity is an example of usability testing?

    • Running extreme data
    • Observing user navigation
    • Counting total sheets
    • Checking formula syntax
  10. What should technical testing of navigation check?

    • User satisfaction
    • Font readability
    • Colour scheme appeal
    • Links work correctly
  11. When is iterative testing carried out during software development?

    • Before planning stage
    • After final release
    • While building solution
    • During maintenance only
  12. Where should actual test results and remedial actions be recorded?

    • In user manual
    • In formula bar
    • In test plan
    • In macro code
  13. Why does a test plan assign a unique number to each test?

    • For easy identification
    • To calculate totals
    • To sort alphabet
    • To hide errors
  14. Entering 10 and 20 to expect 30 tests which spreadsheet aspect?

    • Calculations
    • Navigation
    • Formatting
    • Validation
  15. Which test data best checks a range check from 1 to 100?

    • 0, 1, 100 and 101
    • 50 only
    • Letters only
    • A blank cell only
  16. What should technical testing of spreadsheet output content verify?

    • File size
    • Hardware speed
    • User satisfaction
    • Correct figures
  17. Which test plan column specifies the target of a given test?

    • Test data
    • Test result
    • What is being tested
    • Actual outcome
  18. Why is extreme test data used in a spreadsheet test plan?

    • To check normal values
    • To check range limits
    • To test formatting
    • To find file size
  19. What term describes the inputs used to check if a solution behaves correctly?

    • Test data
    • Output data
    • Metadata
    • Source code
  20. A new user struggles to find the print button. Which type of testing has identified this?

    • Usability testing
    • Calculation testing
    • Technical testing
    • Extreme data testing