Lesson 2g.02

2g.02 Use action and warning lines in quality assurance sampling applications Quiz: Pearson Edexcel Statistics, Unit 2

20 questions

In partnership with Revision Ninja

Lesson 2g.02, Use action and warning lines in quality assurance sampling applications: 20 multiple choice questions for the Pearson Edexcel GCSE Statistics (1ST0), Unit 2: Processing, representing and analysing data, written with Revision Ninja.

Host it live on the board and students join with a game code on their own devices, or revise alone with Free Play. The answers are revealed in the game.

Host this setFree Play

The 20 questions

  1. What is the usual position of warning lines on a quality control chart?

    • 2 standard deviations
    • 3 standard deviations
    • 1 standard deviation
    • 4 standard deviations
  2. Where are action lines set on a quality control chart?

    • 2 standard deviations
    • 5 standard deviations
    • 3 standard deviations
    • 1 standard deviation
  3. In a stable process, about what proportion of sample means fall outside the warning lines?

    • 1 in 100
    • 1 in 1000
    • 1 in 20
    • 1 in 2
  4. Where should almost all sample means lie in a stable manufacturing process?

    • Beyond action limits
    • Below zero level
    • Outside warning lines
    • Inside action lines
  5. What is the standard response when a sample value falls beyond the action lines?

    • Monitor closer
    • Ignore value
    • Take average
    • Stop process
  6. What does a sample point between the warning and action lines typically prompt?

    • Closer monitoring
    • Stop process
    • Ignore value
    • Re-calibrate scale
  7. Which type of chart is commonly used in quality assurance control applications?

    • Scatter diagram
    • Pie chart
    • Sample ranges chart
    • Bar graph
  8. What is the primary purpose of a control chart in manufacturing?

    • Calculate averages
    • Design products
    • Detect limit breaches
    • Measure total output
  9. A process has an expected mean of 50 g and the sample means have an SD of 2 g. What are the warning lines?

    • 46 g and 54 g
    • 40 g and 60 g
    • 44 g and 56 g
    • 48 g and 52 g
  10. A sample mean of 57 g exceeds the 56 g action limit. What is the required action?

    • Increase sample size
    • Continue monitoring
    • Record as normal
    • Stop process
  11. A bag-filling process has expected mean 15.0 kg and SD 0.1 kg for sample means. Which sample mean would be outside an action line?

    • 15.15 kg
    • 15.35 kg
    • 14.85 kg
    • 15.25 kg
  12. A warning line is at 22 g and the expected mean is 20 g. What is the SD of the sample means?

    • 1 g
    • 3 g
    • 0.67 g
    • 2 g
  13. In a stable process, about how many of 200 sample means would be expected outside the warning lines?

    • 10
    • 2
    • 20
    • 100
  14. In quality assurance charts, how do warning lines compare in position to action lines?

    • Both lines identical
    • Action lines closer
    • Warning lines closer
    • Warning lines outside
  15. A chart's centre line is at 80 units, with action lines at 74 and 86. What is the SD of the sample means?

    • 4 units
    • 6 units
    • 2 units
    • 3 units
  16. A process mean is 100 ml, with warning lines at 96 ml and 104 ml. What are the action lines?

    • 90 ml and 110 ml
    • 92 ml and 108 ml
    • 94 ml and 106 ml
    • 96 ml and 104 ml
  17. A population has mean 50 and SD 6. Samples of size 9 are used. What are the action lines for the sample means?

    • 47 and 53
    • 46 and 54
    • 44 and 56
    • 41 and 59
  18. Out of 60 stable process sample means, 9 fall outside the warning lines. What is this?

    • Lower than expected
    • Higher than expected
    • Exactly as expected
    • Impossible result
  19. Why is a point just outside an action line treated more seriously than a warning line breach?

    • Easier to calculate
    • Occurs more often
    • Much lower probability
    • Cheaper to fix
  20. A chart shows 19 points inside warning lines and 1 outside the action line. What should be done?

    • Ignore outlier
    • Reset all lines
    • Double sample rate
    • Investigate point

All Pearson Edexcel Statistics quizzes