The 20 questions

  1. Which production method makes a single unique item for a customer specification?

    • Flow production
    • Job production
    • Batch production
    • Mass production
  2. Which method produces a group of identical items before switching to another?

    • Batch production
    • Flow production
    • Job production
    • Custom production
  3. Which manufacturing process moves products continuously through a fixed sequence of stages?

    • Batch production
    • Flow production
    • Job production
    • Bespoke production
  4. Which product is most likely made using job production?

    • Mass-market newspapers
    • Packaged breakfast cereal
    • A custom-built yacht
    • Standard soft drinks
  5. Which business scenario best illustrates batch production?

    • A custom wedding dress
    • A bespoke house build
    • A bakery making 200 cakes
    • Continuous bottled water
  6. Which production process is most suitable for very high-volume identical goods?

    • Bespoke production
    • Craft production
    • Job production
    • Flow production
  7. A business makes 5,000 identical bottles per day on a continuous line. Which process is this?

    • Batch production
    • Flow production
    • Service provision
    • Job production
  8. A printer produces 500 posters of one design, then 300 of another. Which process is this?

    • Batch production
    • Flow production
    • Service provision
    • Job production
  9. A tailor making a single suit to exact customer measurements uses which process?

    • Flow production
    • Batch production
    • Job production
    • Cell production
  10. A manufacturer's unit cost is £40 on job production and £12 on flow production. What is the saving per unit by switching to flow?

    • £52
    • £28
    • £12
    • £40
  11. What is the most likely effect on unit costs when moving from job to batch production?

    • Increase
    • Double instantly
    • Stay identical
    • Decrease
  12. What is the typical impact of flow production on overall productivity?

    • Stay the same
    • Decrease
    • Increase
    • Fluctuates wildly
  13. What is a major drawback of using job production for custom items?

    • Low quality
    • Zero variety
    • High unit costs
    • Excessive waste
  14. What level of flexibility does batch production offer compared to flow?

    • Some variety
    • Infinite variety
    • Zero variety
    • Identical output
  15. What is the primary short-term financial cost when switching to flow production?

    • High capital expenditure
    • Reduced raw materials
    • Low labour wages
    • Zero marketing costs
  16. Why might a business choose batch production over flow production?

    • Maximum automation
    • Zero setup time
    • Lowest possible cost
    • Product variety
  17. A line produces 600 units per hour with 12 workers. What is the output per worker per hour?

    • 50
    • 600
    • 7,200
    • 12
  18. What is the main operational trade-off of choosing flow production?

    • Lower productivity
    • Poorer quality
    • Lower flexibility
    • Higher unit costs
  19. What is the typical trade-off when automating a batch production line?

    • Slower work rates
    • Lower quality output
    • Reduced fixed costs
    • Investment for productivity
  20. A bakery needs to change its product mix frequently. Which process best fits this need?

    • Flow production
    • Batch production
    • Automated assembly
    • Continuous production